.


›››

 

Seminar Series

PEOSC is organizing a seminar as part of its goal to help members to achieve a better career through seminars.

TOPICWest Toronto Diamond Rail to Rail Grade Separation on the Metrolinx GTS Project

PRESENTER: Murugs C. Muruganandan  P.Eng. PMP

WHERE: Victoria Village Library, 184 Sloane Ave., Scarborough, ON , M4A 2C4  Follow here for MAP

WHEN:  November 5, 2013 Tuesday, 6:30 - 8:00 pm

REGISTRATION: Closed.


 Agenda

6:00 pm               Networking/Refreshments

6:30 pm               Introduction

6:40 pm               Presentation

7:40 pm               Question Period

7:55 pm               Vote of Thanks and Conclusion


About the Presenter:

Murugs C. Muruganandan  P.Eng; PMP is a senior professional with over 40 years of diversified experience in managing major transportation infrastructure projects in Canada and Overseas. Currently, he is working at Metrolinx, an agency of the Government of Ontario, as a Civil Infrastructures Manager. Murugs is one of the team members of the Georgetown South Rail Project ($1.5B) in Toronto where rail link will be provided from the Pearson International Airport to Union Station in downtown Toronto.  

Previously, he held positions as Senior Engineer, Design Review Manager and Senior Project Manager on several multi-million dollar projects and familiar with international design codes for highways, railways, LRTs and bridges. He is also familiar with Canadian and International Standards and Specifications, and co-authored several publications in his field of expertise.   


Synopsis of the Topic: West Toronto Diamond (WTD) Interchange is one of the key grade separations under the Georgetown South Rail Program. The WTD provides rail to road and rail to rail grade separations on the Weston Subdivision. The existing at grade rail to rail crossing impacts service reliability. The completion of this project will remove these operational constraints at this location and provide a designated line for the Union-Pearson Express service. Further it improves the overall on-time performance and customer service, as well as eliminates noise from trains crossing the diamond. This presentation will provide some insights of this on-going program. Follow the link to know more about this Program

| HOME |